School's nearly finished and i've been dreaming of attempting to tie dye. i've also decided to use the yarn i bought for the Ohm bag for my Bible cover and use some old white cotton yarn that i have had lying around forever for the former project instead. i bought some Dylon Permanent Fabric Dye in Burgundy that i plan to dye the white with after i finish the bag.
i really should be working on homework (still have a paper to write and a paper and poems to edit) or studying for finals.
Showing posts with label Bible cover. Show all posts
Showing posts with label Bible cover. Show all posts
Monday, May 11, 2009
Tuesday, April 28, 2009
knitting... slow
So the project i am making the most progress on is Tangy Giselle. i've set aside the sleeve stitches and am nearly to the end of the second ball (which equals 40% of the project if i use all the yarn). i discovered a mistake from a long time ago where i knit 7 sts on a purl row (or purled 7 sts on a knit row) and there is no way that i am fixing it. Taking it out as a ladder would probably destroy the tension / gauge, if not tangle the yarn. Taking it out all the way, even a stitch at a time, is most likely impossible (not to mention extremely inconvenient and time consuming). i can live with such a small mistake, and--let's face it--no one will probably ever notice. It might even be hidden by the hood whenever it's down (which, let's face it, is probably going to be most of the time).
In other project news... haven't gotten any more work done on the Boing socks, did two more rows on Fair Ginny, and am planning to knit a Bible cover now (possibly using ribbon as part of the design). i still haven't bought the size 4 needles for the yoga bag and runner's companion.
i hope to upload some update photos soon. It's getting late, i need to sleep. Luckily i can knit in three of my classes, and can get 3-7 rows done in each one if i put my mind to it. i'm not sure if i'll work on Giselle's sleeves next or continue with the main body of the project. Hmmm.../yawn.
In other project news... haven't gotten any more work done on the Boing socks, did two more rows on Fair Ginny, and am planning to knit a Bible cover now (possibly using ribbon as part of the design). i still haven't bought the size 4 needles for the yoga bag and runner's companion.
i hope to upload some update photos soon. It's getting late, i need to sleep. Luckily i can knit in three of my classes, and can get 3-7 rows done in each one if i put my mind to it. i'm not sure if i'll work on Giselle's sleeves next or continue with the main body of the project. Hmmm.../yawn.
Labels:
Bible cover,
Harry Potter,
running,
sweater,
wrap,
yoga
Subscribe to:
Posts (Atom)